General Information
Completion: | 2016 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Metro tunnel / subway tunnel |
---|---|
Structure: |
Tunnel |
Construction method: |
Cut-and-cover method |
Location
Location: |
Dortmund, North Rhine-Westphalia, Germany |
---|---|
Address: | Marsbruchstraße |
Part of: | |
Coordinates: | 51° 30' 29.09" N 7° 32' 22.61" E |
Coordinates: | 51° 30' 29.65" N 7° 32' 36.67" E |
Technical Information
Dimensions
number of tracks | 2 | |
track length | ca. 1 100 m | |
track gauge | 1 435 mm | |
eastern ramp | length | 146.5 m |
tunnel | length | 267 m |
western ramp | length | 148.5 m |
Materials
trough |
reinforced concrete
|
---|---|
tunnel |
reinforced concrete
|
Participants
Owner
Client
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20072575 - Published on:
10/02/2017 - Last updated on:
14/11/2023