0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1795
Completion: 1799
Status: in use

Project Type

Structure: Vaulted arch bridge
Function / usage: Canal bridge
Material: Masonry bridge

Location

Location: , , ,
Crosses:
  • Goyt River
Coordinates: 53° 24' 26.18" N    2° 4' 7.90" W
Show coordinates on a map

Technical Information

Dimensions

height 27.45 m
span lengths 3 x 18.30 m
number of spans 3

Participants

Construction

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20007284
  • Published on:
    16/12/2002
  • Last updated on:
    29/12/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine