General Information
Completion: | 1913 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Railroad (railway) bridge |
---|---|
Material: |
Steel bridge |
Structure: |
Through truss bridge Swing bridge |
Location
Technical Information
Dimensions
total length | 278.795 m | |
span lengths | 68.728 m - 68.66 m - 68.66 m - 68.728 m | |
number of spans | 4 | |
length of movable section | 68.66 m |
Materials
truss |
steel
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2016): Evaluation of Strengthening Applications for Old Railway Bridges in Egypt. Presented at: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, pp. 2503-2510.
- About this
data sheet - Structure-ID
20072123 - Published on:
10/11/2016 - Last updated on:
24/04/2018