General Information
Status: | in use |
---|
Project Type
Function / usage: |
Pipeline bridge |
---|---|
Structure: |
Cable-stayed bridge with fan system |
Material: |
Reinforced concrete bridge Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
New Plymouth, Taranaki, New Zealand |
---|---|
Coordinates: | 39° 6' 55.24" S 174° 6' 13.70" E |
Technical Information
Dimensions
total length | 75 m | |
number of spans | 3 |
Materials
deck |
precast reinforced concrete
|
---|---|
pylons |
reinforced concrete
|
Participants
Relevant Web Sites
- About this
data sheet - Structure-ID
20010009 - Published on:
19/08/2003 - Last updated on:
27/04/2017