0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 2009
Status: in use

Project Type

Structure: Girder bridge
Function / usage: Road bridge
Construction method: Balanced cantilever method
Material: Prestressed concrete bridge

Location

Location: ,

Technical Information

Dimensions

main span 220 m
height above valley floor or water 220 m

Materials

deck prestressed concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20052337
  • Published on:
    24/01/2010
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine