General Information
Completion: | 1994 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Railroad (railway) bridge |
---|---|
Material: |
deck of approach viaducts: Prestressed concrete bridge |
Structure: |
main span: Through truss bridge |
Material: |
main span: Steel bridge |
Location
Technical Information
Dimensions
main span | 124.2 m | |
total length | 950 m | |
number of spans | 29 |
Materials
truss |
steel
|
---|---|
deck of approach viaducts |
prestressed concrete
|
Participants
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20006513 - Published on:
05/11/2002 - Last updated on:
12/04/2016