General Information
Project Type
Structure: |
machine hall: Vaulted cavern |
---|---|
Function / usage: |
machine hall: Electric power plant |
Function / usage: |
tailrace tunnel (1): Pressure tunnel |
Construction method: |
tailrace tunnel (2): Tunnel boring machine (TBM) |
Function / usage: |
tailrace tunnel (2): Pressure tunnel |
Location
Location: |
New Zealand |
---|---|
Coordinates: | 45° 31' 17.04" S 167° 16' 40.80" E |
Technical Information
Dimensions
capacity for electric power generation | 850 MW | |
access tunnel | tunnel length | 2 km |
machine hall | width | 18 m |
height | 34 m | |
length | 111 m | |
tailrace tunnel (1) | diameter | 9 m |
tunnel length | 10 km | |
tailrace tunnel (2) | tunnel length | 10 km |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
- About this
data sheet - Structure-ID
20027192 - Published on:
01/03/2007 - Last updated on:
23/07/2014