0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: March 2000
Completion: January 2006
Duration of works: 71 months
Status: in use

Project Type

Function / usage: Road tunnel
Structure: Tunnel

Location

Location: , , ,
Address: B 260
Coordinates: 50° 19' 41.23" N    7° 43' 45.28" E
Coordinates: 50° 19' 48.83" N    7° 42' 30.82" E
Show coordinates on a map

Technical Information

Dimensions

total length 1 540 m
wall thickness 0.90 m
roadway / carriageway width 2 x 3.75 m
number of tubes 1

Quantities

concrete volume 56 500 m³
excavated material 265 000 m³
total length of piles 1 700 m

Cost

cost of construction Euro 45 000 000

Materials

tunnel structure reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20034803
  • Published on:
    02/03/2008
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine