0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Maison de la culture de Bourges

General Information

Beginning of works: April 2018
Completion: 10 September 2021
Status: in use

Project Type

Function / usage: Theater building

Location

Location: , , ,
Coordinates: 47° 4' 37.94" N    2° 23' 54.83" E
Show coordinates on a map

Technical Information

Dimensions

gross floor area 8 660 m²
hall Agnès Varda seats 160
hall Alice Guy seats 120
hall Gabriel Monnet seats 700
hall Pina Bausch seats 200

Cost

construction cost (without tax) Euro 32 900 000

Participants

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20082796
  • Published on:
    02/05/2022
  • Last updated on:
    02/05/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine