General Information
Project Type
Function / usage: |
Theater building |
---|
Location
Location: |
Bourges, Cher (18), Centre-Val de Loire, France |
---|---|
Coordinates: | 47° 4' 37.94" N 2° 23' 54.83" E |
Technical Information
Dimensions
gross floor area | 8 660 m² | |
hall Agnès Varda | seats | 160 |
hall Alice Guy | seats | 120 |
hall Gabriel Monnet | seats | 700 |
hall Pina Bausch | seats | 200 |
Cost
construction cost (without tax) | Euro 32 900 000 |
Participants
Owner
Architecture
Structural engineering
Earthworks
Relevant Web Sites
- About this
data sheet - Structure-ID
20082796 - Published on:
02/05/2022 - Last updated on:
02/05/2022