0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2008
Completion: 18 September 2009
Status: in use

Project Type

Location

Location: , , ,
, , ,
Address: Staatsstraße 2277
Crosses:
  • Main River
Replaces: Mainbrücke Bergrheinfeld (1960)
Coordinates: 50° 0' 18.19" N    10° 11' 10.34" E
Show coordinates on a map

Technical Information

Dimensions

main span 109.5 m
width 13 m
total length 183 m
number of lanes 2

Cost

cost of construction Euro 8 800 000

Materials

deck steel
piers reinforced concrete
arches steel
abutments reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20055122
  • Published on:
    11/03/2010
  • Last updated on:
    25/12/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine