0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Main workshop of the Berlin sanitation department

General Information

Name in local language: Hauptwerkstatt der Berliner Stadtreinigung
Beginning of works: 1970
Completion: 26 November 1973
Status: in use

Project Type

Function / usage: Warehouse
Material: Reinforced concrete structure

Awards and Distinctions

Location

Location: , , ,
Address: Ringbahnstraße 88
Coordinates: 52° 28' 9.22" N    13° 22' 47.73" E
Show coordinates on a map

Technical Information

Dimensions

width 58 m
length 220 m

Cost

cost of construction German Mark 26 000 000

Materials

foundations reinforced concrete
building structure precast reinforced concrete

Participants

Initial construction (1970-1973)
Architecture
Structural engineering
Extension (1977-1978)
Architecture
Structural engineering

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20086118
  • Published on:
    18/06/2023
  • Last updated on:
    18/06/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine