Main workshop of the Berlin sanitation department
General Information
Name in local language: | Hauptwerkstatt der Berliner Stadtreinigung |
---|---|
Beginning of works: | 1970 |
Completion: | 26 November 1973 |
Status: | in use |
Project Type
Function / usage: |
Warehouse |
---|---|
Material: |
Reinforced concrete structure |
Awards and Distinctions
2006 |
for registered users |
---|
Location
Location: |
Berlin-Tempelhof, Tempelhof-Schöneberg, Berlin, Germany |
---|---|
Address: | Ringbahnstraße 88 |
Coordinates: | 52° 28' 9.22" N 13° 22' 47.73" E |
Technical Information
Dimensions
width | 58 m | |
length | 220 m |
Cost
cost of construction | German Mark 26 000 000 |
Materials
foundations |
reinforced concrete
|
---|---|
building structure |
precast reinforced concrete
|
Participants
Initial construction (1970-1973)
Architecture
Structural engineering
- Stefan Polónyi (structural engineer)
Extension (1977-1978)
Architecture
Structural engineering
- Stefan Polónyi (structural engineer)
Relevant Web Sites
Relevant Publications
- Architektur und Tragwerk. 1st edition, Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), pp. 135. (2003):
- Stefan Polónyi. Tragende Linien - Tragende Flächen/Bearing Lines - Bearing Surfaces. Edition Axel Menges, Stuttgart (Germany), ISBN 978-3936681581, pp. 156. (2012):
- About this
data sheet - Structure-ID
20086118 - Published on:
18/06/2023 - Last updated on:
18/06/2023