General Information
Completion: | 1999 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Steel-prestressed concrete composite bridge |
Structure: |
Box girder bridge |
Location
Location: |
Alcalá de Henares, Madrid, Spain |
---|---|
Coordinates: | 40° 28' 22.35" N 3° 25' 3.77" W |
Technical Information
Dimensions
total length | 98.209 m | |
span lengths | 9.932 m - 3 x 26.00 m - 10.277 m | |
number of spans | 5 |
Materials
deck slab |
prestressed concrete
|
---|---|
abutments |
reinforced concrete
|
bottom flange |
prestressed concrete
|
webs |
steel
|
Participants
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- El puente nº 3 sobre la carretera N-II del distribuidor regional del este, Alcalá de Henares, Madrid. In: Hormigón y acero, v. 50, n. 214 (4th Quarter 1999), pp. 59-67. (1999):
- About this
data sheet - Structure-ID
20076264 - Published on:
01/11/2018 - Last updated on:
01/11/2018