General Information
| Completion: | 1979 |
|---|---|
| Status: | in use |
Project Type
| Structure: |
Cable-stayed bridge with semi-fan system Two-span cable-stayed bridge |
|---|---|
| Function / usage: |
Railroad (railway) bridge |
| Material: |
Reinforced concrete bridge Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
| Support conditions: |
for registered users |
| Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Location
| Location: |
Virginia Water, Surrey, South East England, England, United Kingdom Chertsey, Surrey, South East England, England, United Kingdom |
|---|---|
| Crosses: |
|
| Part of: | |
| Coordinates: | 51° 23' 34.50" N 0° 31' 55.85" W |
Technical Information
Dimensions
| span lengths | 2 x 54.87 m | |
| number of spans | 2 | |
| deck | deck depth | 2.76 m |
| deck width | 11.56 m |
Materials
| deck |
reinforced concrete
|
|---|---|
| piers |
reinforced concrete
|
| pylons |
reinforced concrete
|
| abutments |
reinforced concrete
|
Participants
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (1982): Lyne Railway Underbridge over the M25. In: Proceedings of the Institution of Civil Engineers, v. 72, n. 4 (November 1982), pp. 585-610.
- (1985): Ponts haubanées. Presses Polytechniques et Universitaires Romandes, Lausanne (Switzerland), pp. 185-186.
- About this
data sheet - Structure-ID
20001088 - Published on:
07/10/2000 - Last updated on:
02/01/2018


