0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Luokou Yellow River Railway Bridge

General Information

Beginning of works: April 1909
Completion: October 1912
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Yellow River (Huang He)
Coordinates: 36° 43' 35.33" N    117° 0' 2.35" E
Show coordinates on a map

Technical Information

Dimensions

width 10.8 m
total length 1 255.2 m
number of spans 12
main bridge
main span 164.7 m
total length 422.1 m
length of drop-in span 109.8 m
cantilever length 27.45 m

Materials

truss steel

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20078965
  • Published on:
    03/01/2020
  • Last updated on:
    03/01/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine