General Information
Completion: | 2011 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Structure: |
Stressed ribbon bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Lubień, Lesser Poland Voivodeship, Poland |
---|---|
Coordinates: | 49° 43' 14.66" N 19° 59' 10.98" E |
Technical Information
Dimensions
width | 5.54 m | |
deck depth | 0.47 m | |
sag | 1.40 m | |
span | 71.4 m | |
length | 91.4 m | |
number of cables | 8 |
Materials
deck |
prestressed concrete
|
---|---|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- The Pre-Stressed Concrete Ribbon Bridge under Moveable Track Load on Base of Calculation and Tests of Bridge in Lubień, Poland. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):
- About this
data sheet - Structure-ID
20071836 - Published on:
15/10/2016 - Last updated on:
31/10/2016