0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1971
Status: in use

Project Type

Function / usage: Road tunnel
Structure: Tunnel

Location

Location: , , ,
Address: I-94
For:
  • Interstate I-94
For: Interstate 94
Coordinates: 44° 57' 54.39" N    93° 17' 15.04" W
Coordinates: 44° 58' 10.05" N    93° 17' 15.64" W
Show coordinates on a map

Technical Information

There currently is no technical data available.

Excerpt from Wikipedia

Lowry Hill Tunnel is a tunnel approximately 1600 ft in length accommodating the Interstate 94 (I-94) freeway near downtown Minneapolis, Minnesota that was completed in late 1971. It is placed at a near-right-angle turn in the highway, forcing the three lanes of traffic in each direction to slow down. The advised speed is 35 miles per hour (56 km/h).

Although constructed as a tunnel through rock, the surface a few yards above is covered with roadways. The tunnel functions as if it were the underpass under a 0.25-mile-wide (400 m) bridge which carries Hennepin Avenue, Lyndale Avenue, and various ramps over I-94.

It is a bottleneck due to ist dog-leg turn, and various proposals have been made for dealing with it. In May 2005, one city engineer proposed restriping it to four lanes in each direction. This would not help the slowdown, but would theoretically allow more cars through it at a given time. The tunnel is also a leading contender for a new high-occupancy toll lane using the MnPASS electronic toll collection system.

Some believe that Interstate 335, a proposed but never-built freeway north of downtown between I-94 and Interstate 35W, would have alleviated the traffic problems in the tunnel. However, others have noted that the highway would not have benefited many drivers, particularly since the nearby interchange between I-35W and I-94 is missing certain links. There is no connection to carry southbound I-35W traffic to eastbound I-94, or westbound I-94 traffic to northbound I-35W, both of which would have been important flows if I-335 were to be successful.

Opened in November of 1971, this tunnel was built with $31 million dollars to help fix the congestion of 30,000 vehicles a day. Today, the Lowry Hill Tunnel sees an average of 185,000 vehicles pass through it each day making it one of the worlds busiest tunnels - if not the busiest. For comparison, that is 54% more vehicles than those passing through the Lincoln Tunnel that connects New Jersey to Manhattan.

Text imported from Wikipedia article "Lowry Hill Tunnel" and modified on July 23, 2019 according to the CC-BY-SA 4.0 International license.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20051228
  • Published on:
    02/01/2010
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine