0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Löwenherz-Tunnel
Beginning of works: 1991
Completion: 1995
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , , ,
Coordinates: 49° 12' 34.38" N    7° 57' 48.36" E
Coordinates: 49° 12' 18.38" N    7° 57' 12.33" E
Show coordinates on a map

Technical Information

Dimensions

total length 899.5 m
clear interior profile 9.50 m x 4.50 m
tunnel length 404.5 m
gallery length 495.0 m

Cost

cost of construction German Mark 40 700 000

Materials

tunnel structure reinforced concrete
retaining wall reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001179
  • Published on:
    17/12/2000
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine