0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Metro de Los Teques
Completion: 3 November 2006
Status: in use

Project Type

Function / usage: Metro (rapid transit) network

Location

km Name

Technical Information

Dimensions

number of stations 5
system length 11.2 km
track gauge 1 435 mm
number of lines 1

Excerpt from Wikipedia

The Los Teques Metro is a suburban mass-transit system in the city of Los Teques, Venezuela with connections to important surrounding cities and communities. It was opened to public service on November 3, 2006. The Los Teques Metro currently[when?] operates one service (branded as lines 1 and 2 for the two parts of the system) connecting 5 stations, with additional stations for Line 2 under construction.

The system connects the city of Los Teques with the capital city of Caracas. The Los Teques Metro is operated by Metro de Caracas – as such, it is effectively a subsidiary/extension of the Caracas Metro, and is widely viewed as part of that system. It is ascribed to the Venezuelan government and the Ministry of Infrastructure. The government of Miranda State and the mayorship of the Guaicaipuro Municipality are also financing its development.

The New Line 2-3 Project New Alstom Metropolis Train Departing Ali Primera Station

The currently[when?] operating line runs for 11.2 kilometers (7.0 mi), parallel to the San Pedro River, establishing a link between Las Adjuntas and Independencia Station.

History

The subway plans date back to 1982 when it was first proposed. However, it wouldn't be until October 19, 1998 when the Metro de Los Teques transit corporation was created (now defunct) in order to carry out management, administrative duties and civil works related to the project. It was supposed to alleviate the congestion of the Panamerican Highway and ease commuting between the two cities, because of their proximity. The operation was subsequently taken over by Metro de Caracas and plans were extended to include expansion to San Antonio and a 3rd line to connect to 2nd point in Caracas.

Construction for the first phase began in 2001 with works including the canalization of the San Pedro River, the tunneling and building of the bridges until reaching Las Adjuntas. It is estimated that the project cost was about 800 million US dollars.

The metro system began with restricted operations:

  • 2 railways through a single tunnel;
  • 2 or 3 trains;
  • Daily service between 5:20 a.m and 11:00 p.m

Operations

The second rail within the same tunnel was formally inaugurated October 22, 2007. Trial and testing period continued with additional trains and full 7 day service from 5:10 a.m. until 11:00 p.m. implemented on November 19, 2007.

The 9.5-kilometer (5.9 mi) ride between Las Adjuntas and Independencia as of July 5, 2015[update] is 4,00 bolívares Bs.F for a one way ride and the price includes a subway ride within the Caracas Metro network.

Type Coverage Fare Notes Subway One Way One ride to or from Los Teques to any Caracas Metro station 4,00 Bolivares Bs.F Valid for all Caracas Metro stations Return Trip 2 rides 8,00 Bolivares Bs.F same as above Multi-Abono Integrad 10 rides 40,00 Bolivares Bs.F Available at all Caracas Metro stations Student Multi-Abono 10 rides 20,00 Bolivares Bs.F Available at some Caracas Metro stations: Maternidad; Caño Amarillo; Parque del Este; El Silencio and Caricuao.

Los Teques Metro was provided with an integrated operation control centre, command and communications by Thales.

Future plans

Construction of the extension formally started March 20, 2007. This extension known as Line 2 to the system will be 12 km (7.5 mi) with 3 new stations within the city, 2 in nearby communities and finally terminating in San Antonio de Los Altos with the central Los Teques stations.

Line 4 adds four stations that are currently[when?] under construction are:

  • Los Cerritos, inauguration TBA
  • Carrizal, inauguration TBA
  • Las Minas, inauguration TBA
  • San Antonio, inauguration TBA

Line 3 has been proposed 18.5 km (11.5 mi). It will commence from San Antonio and connect some communities before looping towards the La Rinconada Caracas Metro Station.

  • La Morita
  • San Diego
  • Potrerito
  • La Mariposa
  • La Rinconada

Timeline of line extensions

Line Station Station Length Status 1 Las Adjuntas Ayacucho 8.1 km opened, on October 7, 2015 Las Adjuntas Alí Primera 9.5 km In everyday service, since November 3, 2006 2 Alí Primera Guaicaipuro 0.7 km opened on December 11, 2012 Guaicaipuro Independencia 1.0 km opened on December 1, 2013 Independencia Los Cerritos 1.7 km under construction, for service TBA Los Cerritos Carrizal 1.7 km under construction, for service TBA Carrizal La Carbonera -.- km under construction, for service TBA Carrizal Las Minas 4.3 km under construction, for service TBA Las Minas San Antonio 2.5 km under construction, for service TBA 3 San Antonio La Morita 1.5 km under construction, for service TBA La Morita San Diego 1.6 km under construction, for service TBA San Diego Potrerito 4.9 km under construction, for service TBA Potrerito La Mariposa 3.0 km under construction, for service TBA La Mariposa Panamericana 7.5 km under construction, for service TBA

Text imported from Wikipedia article "Los Teques Metro" and modified on January 3, 2025 according to the CC-BY-SA 4.0 International license.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20090202
  • Published on:
    02/01/2025
  • Last updated on:
    02/01/2025
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine