0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Los Cruces - Palmarito Trail Bridge

General Information

Beginning of works: 5 February 2018
Completion: 11 May 2018
Status: in use

Project Type

Location

Location: , ,
Location description: The bridge crosses the Santa Maria river.
Coordinates: 8° 17' 31.34" N    81° 6' 14.25" W
Show coordinates on a map

Technical Information

Dimensions

span 88 m

Materials

cables steel wire
pylons steel
anchorages reinforced concrete
deck flooring Treated pine

Notes

The bridge built by Bridges to Prosperity serves around 282 people in the communities of Palmarito, LA Gorda, Llano grande, LA peña, LA Cuesta, la utiria, LA mina, Los pinto, naranjal.Los cruces, guacatal, los aguilares, los hermandez, corita, los gonzalez, el poste, la ajilla, los filipinas, corita los perez.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20084645
  • Published on:
    25/01/2023
  • Last updated on:
    27/01/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine