0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Los Angeles Metro Rail C Line

General Information

Other name(s): Los Angeles Metro Green Line
Completion: 12 August 1995
Status: in use

Project Type

Function / usage: Tramway line

Location

km Name

Technical Information

Dimensions

length 28.6 km
number of tracks 2
number of stations 11
track gauge 1 435 mm

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    10001502
  • Published on:
    09/02/2009
  • Last updated on:
    26/12/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine