General Information
Project Type
Structure: |
Covered bridge |
---|---|
Material: |
Timber bridge |
Function / usage: |
Bicycle and pedestrian bridge |
Structure: |
Through truss bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Lörrach, Lörrach (Kreis), Baden-Württemberg, Germany |
---|---|
Crosses: |
|
Replaces: |
Lörrach Footbridge (1983)
|
Coordinates: | 47° 37' 50.56" N 7° 39' 59.12" E |
Technical Information
Dimensions
total length | 85.10 m | |
span lengths | 23.80 m - 3.50 m - 57.80 m | |
deck width | 2.80 m | |
number of spans | 3 | |
bridge surface | 238.28 m² |
Quantities
substructure | concrete volume | 2.5 m³ |
reinforcing steel | 1.5 t | |
superstructure | structural steel | 30 t |
timber | 146 m³ |
Design Loads
design code(s) | DIN EN 1991-2 |
Cost
cost of construction | Euro 980 000 |
Materials
truss |
glued laminated timber (glulam)
|
---|---|
abutments |
reinforced concrete
|
pier |
steel
|
Participants
Owner
Client
Design
Checking engineering
- Rouven Erhardt (checking engineer)
Contractor
Subcontractor
Construction management
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2017. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2017, pp. 21-35.
- About this
data sheet - Structure-ID
20074770 - Published on:
16/02/2018 - Last updated on:
06/04/2018