General Information
Completion: | 2004 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Structure: |
Haunched girder bridge |
Location
Location: |
Quéven, Morbihan (56), Bretagne, France Caudan, Morbihan (56), Bretagne, France |
---|---|
Address: | RN 165 |
Crosses: |
|
Carries: |
|
Next to: |
Lorient-Lanester Bridge (1976)
|
Coordinates: | 47° 46' 26.42" N 3° 22' 7.79" W |
Coordinates: | 47° 46' 27.35" N 3° 22' 8.53" W |
Technical Information
Materials
deck |
prestressed concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Un système d'assanissement durable pour les deux nouveaux ponts sur le Scorff. In: Ouvrages d'art, n. 50 (November 2005). (2005):
- About this
data sheet - Structure-ID
20019974 - Published on:
12/03/2006 - Last updated on:
05/02/2016