General Information
Completion: | 30 October 2022 |
---|---|
Status: | in use |
Project Type
Structure: |
Two-span single-pylon cable-stayed bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Rotation around a vertical axis |
Material: |
Steel bridge |
Support conditions: |
for registered users |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
roadway / carriageway width | 2 x 11.50 m | |
main bridge | ||
---|---|---|
main span | 190 m | |
span lengths | 190 m - 150 m | |
deck | deck depth | 3.000 m |
deck width | 36.3 m | |
stay anchor spacing | 15 m | |
piles | diameter | 2.50 m |
pylon | height | 126.74 m |
Quantities
concrete volume | 15 800 m³ |
Cost
cost of construction | Renminbi Yuan 1 200 000 000 |
Materials
pylon |
reinforced concrete
|
---|---|
deck |
steel
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Swivel Construction of a Cable-Stayed Bridge for Minimal Disturbance to Adjacent Railways. In: Structural Engineering International, v. 33, n. 3 (July 2023), pp. 1-8. (2023):
- About this
data sheet - Structure-ID
20086933 - Published on:
14/09/2023 - Last updated on:
14/09/2023