Name in local language: | Sudbachtalbrücke Löhne-Gohfeld |
---|---|
Beginning of works: | September 2019 |
Completion: | February 2020 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Prestressed concrete bridge |
Support conditions: |
for registered users |
Structure: |
Quadruple T-section girder bridge |
Construction method: |
Precast girders with cast-in-situ slab |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Löhne, Herford (Kreis), North Rhine-Westphalia, Germany |
---|---|
Coordinates: | 52° 10' 54.43" N 8° 44' 55.10" E |
Technical Information
Dimensions
total length | 99.55 m | |
span lengths | 30.82 m - 37.90 m - 30.83 m | |
number of spans | 3 | |
bridge surface | 2 134 m² | |
total width | 22.10 m | |
deck | deck depth | 1.72 m |
Quantities
concrete volume | 3 100 m³ | |
prestressing steel | 70 t | |
reinforcing steel | 350 t | |
piles | total length of piles | 320 m |
Cost
cost of construction | Euro 5 600 000 |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
cross beams |
reinforced concrete
|
girders |
precast prestressed concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Chronik des Brückenbaus. Presented at: 30. Dresdner Brückenbausymposium, 8./9. März 2021, Dresden (Germany), pp. 91. (2021):
- About this
data sheet - Structure-ID
20083102 - Published on:
10/06/2022 - Last updated on:
10/06/2022