0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Lohbergtunnel
Beginning of works: February 2004
Completion: 29 June 2007
Status: in use

Project Type

Function / usage: Road tunnel
Construction method: Drilling and blasting
Structure: Tunnel

Location

Location: , , ,
Address: B 426
Coordinates: 49° 49' 35.09" N    8° 42' 54.92" E
Coordinates: 49° 49' 4.15" N    8° 42' 31.01" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 1 080 m

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20028702
  • Published on:
    29/06/2007
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine