0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Liujiang Yellow River Bridge

General Information

Other name(s): Second Zhengzhou Yellow River Highway Bridge
Beginning of works: April 2002
Completion: 1 October 2004
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Yellow River (Huang He)
Coordinates: 34° 52' 50.78" N    113° 48' 45.62" E
Show coordinates on a map

Technical Information

Dimensions

total length 9 848.16 m
deck width 2 x 19.484 m
number of lanes 2 x 4
approach viaducts
total length 9 035 m
standard span lengths 127 x 35 m
81 × 50 m
27 × 20 m
main bridge
total length 800 m
span lengths 8 x 95.50 m
number of spans 8

Materials

arches concrete-filled steel tubes

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20068233
  • Published on:
    12/01/2016
  • Last updated on:
    21/05/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine