General Information
Other name(s): | Second Zhengzhou Yellow River Highway Bridge |
---|---|
Beginning of works: | April 2002 |
Completion: | 1 October 2004 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Tied-arch bridge |
Material: |
Concrete-filled steel tube (CFST) bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Zhengzhou, Henan, China |
---|---|
Crosses: |
|
Coordinates: | 34° 52' 50.78" N 113° 48' 45.62" E |
Technical Information
Dimensions
total length | 9 848.16 m | |
deck width | 2 x 19.484 m | |
number of lanes | 2 x 4 | |
approach viaducts | ||
---|---|---|
total length | 9 035 m | |
standard span lengths | 127 x 35 m 81 × 50 m 27 × 20 m |
|
main bridge | ||
total length | 800 m | |
span lengths | 8 x 95.50 m | |
number of spans | 8 |
Materials
arches |
concrete-filled steel tubes
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20068233 - Published on:
12/01/2016 - Last updated on:
21/05/2023