0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Lingenbergtunnel
Beginning of works: 2006
Completion: 2007
Status: in use

Project Type

Function / usage: Road tunnel
Structure: Tunnel

Location

Location: , , , ,
Address: B 257
Coordinates: 50° 30' 36.66" N    6° 58' 48.61" E
Coordinates: 50° 30' 29.86" N    6° 58' 47.72" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 212 m

Cost

cost of construction Euro 7 500 000

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20020125
  • Published on:
    20/03/2006
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine