0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1986
Completion: 1991
Status: in use

Project Type

Structure: Girder bridge
Function / usage: Motorway bridge / freeway bridge
Construction method: Balanced cantilever method

Location

Location: , ,
Coordinates: 45° 7' 9" N    13° 48' 24" E
Show coordinates on a map

Technical Information

Dimensions

total length 552 m
span lengths 80 m - 100 m - 160 m - 100 m - 80 m
number of spans 5
height above valley floor or water 120 m
deck deck depth 5.0 m

Cost

cost of construction United States dollar 9 000 000

Chronology

September 1986
— June 1991

Construction period.

Participants

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001504
  • Published on:
    29/06/2001
  • Last updated on:
    02/01/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine