0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1993
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel
Construction method: Cut-and-cover method

Location

Location: , , ,
Coordinates: 51° 30' 38.44" N    0° 2' 24.99" W
Coordinates: 51° 30' 30.51" N    0° 1' 21.22" W
Coordinates: 51° 30' 27.50" N    0° 1' 44.75" W
Show coordinates on a map

Technical Information

Dimensions

tunnel length 1.8 km

Cost

cost of construction Pound sterling 293 300 000

Chronology

1986

Commissioning of feasibility study.

May 1993

Opening.

2000

Ownership is transferred to Transport for London, with maintenance provided by RMS Ltd.

Participants

Current owner
Initial construction
Owner

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20010488
  • Published on:
    17/10/2003
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine