0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 2005
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Lhasa River
Part of:
Coordinates: 29° 37' 34.39" N    91° 1' 54.30" E
Show coordinates on a map

Technical Information

Dimensions

main span 108 m
total length 928.85 m

Materials

piers reinforced concrete
arches steel
truss steel

Chronology

1 July 2006

Opening of the Qinghai-Tibet railway.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20016363
  • Published on:
    17/05/2005
  • Last updated on:
    20/03/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine