General Information
Completion: | 1913 |
---|---|
Status: | out of service |
Project Type
Structure: |
Tied-arch bridge |
---|---|
Function / usage: |
Railroad (railway) bridge |
Material: |
Steel bridge |
Structure: |
Deck arch bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Hillion, Côtes-d'Armor (22), Bretagne, France Morieux, Côtes-d'Armor (22), Bretagne, France |
---|---|
Coordinates: | 48° 30' 26.28" N 2° 36' 48.41" W |
Technical Information
Dimensions
total length | 238 m | |
span lengths | 8 x 12 m | |
number of spans | 8 | |
height above valley floor or water | 27.6 m |
Materials
piers |
masonry
|
---|---|
arches |
steel
|
Participants
Design
- Louis Harel de la Noë (designer)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken am Weg. Frühe Brücken aus Eisen und Beton in Deutschland und Frankreich. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), ISBN 978-3-433-01299-4, pp. 142-144. (1997):
- Guide du patrimoine. Bretagne. Monum. Editions du patrimoine, Paris (France), pp. 369. (2002):
- About this
data sheet - Structure-ID
20002058 - Published on:
30/09/2001 - Last updated on:
05/02/2016