General Information
Completion: | 20 May 1796 |
---|---|
Duration of works: | 1945 years |
Status: | destroyed |
Project Type
Material: |
Iron bridge |
---|---|
Structure: |
Arch bridge |
Function / usage: |
Pedestrian bridge (footbridge) |
Location
Location: |
Łażany, Lower Silesian Voivodeship, Poland |
---|---|
Coordinates: | 50° 57' 17.98" N 16° 29' 53.84" E |
Technical Information
Dimensions
span | 12.50 m | |
arches | height | 2.885 m |
length | 16.85 m |
Materials
deck |
cast iron
|
---|---|
arches |
cast iron
|
deck flooring |
stone
|
Participants
Design
- John Baildon (designer)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Two historic footbridges being the cultural heritage – the early times of cast iron usage. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):
- About this
data sheet - Structure-ID
20071828 - Published on:
15/10/2016 - Last updated on:
27/05/2021