General Information
Name in local language: | Pont Laurent-Barbier |
---|---|
Other name(s): | Rapilly Bridge |
Beginning of works: | 2012 |
Completion: | March 2014 |
Status: | in use |
Project Type
Structure: |
Unbraced tied-arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel-reinforced concrete composite bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Hauconcourt, Moselle (57), Grand-Est, France Ennery, Moselle (57), Grand-Est, France |
---|---|
Crosses: |
|
Replaces: |
Ennery Suspension Bridge (1948)
|
Coordinates: | 49° 13' 24.84" N 6° 11' 53.09" E |
Technical Information
Dimensions
main span | 108 m | |
width | 21 m | |
height | 18 m | |
total length | 176 m | |
span lengths | 34 m - 108 m - 34 m | |
number of spans | 3 |
Quantities
structural steel | 1 605 t |
Cost
construction cost (without tax) | Euro 13 500 000 |
Materials
piers |
reinforced concrete
|
---|---|
arches |
steel
|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
main girders |
steel
|
Participants
Architecture
-
Groupe Renaissance
- Laurent Barbier (architect)
Technical advisor to the client
Contractor
Steel construction
Relevant Web Sites
- About this
data sheet - Structure-ID
20065930 - Published on:
31/01/2014 - Last updated on:
04/08/2022