0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Lobdeburg-Tunnel
Official designation: BW 189
Beginning of works: 2004
Completion: 2010
Duration of works: 68 months
Status: in use

Project Type

Function / usage: Road tunnel
Construction method: Cut-and-cover method
Structure: Tunnel

Location

Location: , ,
Part of:
Coordinates: 50° 52' 45" N    11° 36' 30" E
Show coordinates on a map

Technical Information

Dimensions

length 600 m
number of lanes 2 x 4
total width 46.40 m

Quantities

concrete volume 65 000 m³
reinforcing steel 7 500 t
volume of earthworks 400 000 m³

Materials

tunnel structure reinforced concrete

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20032117
  • Published on:
    30/09/2007
  • Last updated on:
    06/08/2015
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine