0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1927
Completion: 1929
Status: in use

Project Type

Function / usage: Road bridge
Structure: Half-through arch bridge
Material: Reinforced concrete bridge

Location

Location: , , ,
Crosses:
  • Allier River
Coordinates: 45° 6' 2.70" N    3° 29' 56.69" E
Show coordinates on a map

Technical Information

Dimensions

span lengths 2 x 69 m
number of spans 2

Materials

deck reinforced concrete
arches reinforced concrete

Chronology

1979

Replacement of the suspenders.

Participants

Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20022317
  • Published on:
    18/07/2006
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine