General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Twin girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Location
Location: |
Teilhède, Puy-de-Dôme (63), Auvergne-Rhône-Alpes, France |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 45° 57' 56.81" N 3° 3' 18.82" E |
Technical Information
Dimensions
span lengths | 50 m - 80 m 50 m | |
number of spans | 3 | |
deck | width | 13.46 m |
on-center distance between girders | 7 m | |
deck slab thickness | ø 26 cm | |
piers | diameter | 3.50 m |
Materials
deck slab |
reinforced concrete
|
---|---|
girders |
steel
|
Participants
Owner
Client
Architecture
Structural engineering
Main contractor
Civil works
Steel construction
Bearings
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Viaduc de Lalong. Le petit lot en plus. In: BTP Magazine, n. 183 (February 2005), pp. 52-53. (2005):
- About this
data sheet - Structure-ID
20012339 - Published on:
29/06/2004 - Last updated on:
05/02/2016