0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Laineck Noise Protection Tunnel

General Information

Beginning of works: 2004
Completion: October 2006
Duration of works: 34 months
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel
Construction method: Cut-and-cover method

Location

Location: , ,
Connects to: A 9 Red Main Bridge
Coordinates: 49° 57' 24.45" N    11° 36' 24.59" E
Coordinates: 49° 57' 12.72" N    11° 36' 27.36" E
Show coordinates on a map

Technical Information

Dimensions

number of tubes 2
deck slab thickness 0.95 - 1.05 m
exterior walls thickness 0.85 m
piles diameter 1.20 m
eastern tube
length 360 m
interior width 17 m
number of lanes 3
roadway / carriageway width 14.30 m
western tube
length 310 m
interior width 18.75 m
number of lanes 3 + 1

Cost

cost of construction Euro 14 000 000

Materials

deck slab reinforced concrete (B 35)
walls reinforced concrete (B 35)

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20047921
  • Published on:
    23/08/2009
  • Last updated on:
    21/06/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine