Beginning of works: 2008
Completion: 2010
Duration of works: 28 months
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Lahn River
Coordinates: 50° 44' 46" N    8° 44' 25" E
Show coordinates on a map

Technical Information

Dimensions

total length 300 m
span lengths 65 m - 90 m - 85 m - 60 m
deck width 29.50 m
number of spans 4
bridge surface 8 850 m²

Quantities

deck structural steel 2 530 t
concrete volume 3 600 m³
reinforcing steel 990 t
substructure concrete volume 4 800 m³
reinforcing steel 430 t

Cost

cost of construction Euro 19 500 000

Materials

deck composite steel-reinforced concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20064688
  • Published on:
    06/03/2013
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine