General Information
Other name(s): | Temburong Bridge CC4 Viaduct |
---|---|
Beginning of works: | 16 January 2016 |
Completion: | 17 March 2020 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Multiple T-section girder bridge |
Construction method: |
Precast girders with cast-in-situ slab |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Brunei |
---|---|
Part of: | |
Coordinates: | 4° 50' 48.05" N 115° 6' 46.52" E |
Coordinates: | 4° 45' 31.12" N 115° 10' 13.74" E |
Technical Information
Dimensions
total length | 12 km | |
standard span lengths | 12 m |
Materials
deck |
precast prestressed concrete
|
---|---|
piers |
reinforced concrete
|
piles |
reinforced concrete
|
deck slab |
reinforced concrete
|
pile caps |
composite steel-reinforced concrete
precast reinforced concrete |
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2015): Temburong Bridge, Brunei – CC4 Swamp Crossing in Temburong District. Presented at: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, pp. 2054-2061.
- About this
data sheet - Structure-ID
20071792 - Published on:
13/10/2016 - Last updated on:
26/08/2020