0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2009
Completion: 2011
Status: in use

Project Type

Location

Location: , , ,
Address: A7
Coordinates: 38° 40' 26.69" N    0° 27' 53.69" W
Show coordinates on a map

Technical Information

Dimensions

span lengths 2 x 102.50 m
deck width 2 x 11.30 m
number of spans 2

Notes

The bridge is a hybrid structure consisting of a central prestressed concrete box girder with 60 meter spans on either side of the middle pier connected with steel-concrete composite box girders on both ends (42.5 meters long).

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20068136
  • Published on:
    17/12/2015
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine