General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Precast segmental construction |
Material: |
Prestressed concrete bridge |
Location
Technical Information
Dimensions
total length | 3.7 km | |
span lengths | 35-48 m |
Quantities
prestressing steel | 2 100 t |
Materials
superstructure |
precast prestressed concrete
|
---|
Participants
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Hong Kong. Viaduc autoroutier préfabriqué. Kwun Tong: Hong Kong vu du pont. In: Travaux, n. 673 (February 1992), pp. 39-44. (1992):
- On the fast track with Hong Kong's first precast segmental project. In: VSL News, v. 2, n. 2 ( 1991), pp. 15. (1991):
- Le viaduc de Kwun Tong bypass à Hong Kong. Etudes et transfert de technologie. Presented at: , pp. 101-108. :
- About this
data sheet - Structure-ID
20004059 - Published on:
01/07/2002 - Last updated on:
05/02/2016