0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Küstrin-Kietz Oder River Rail Bridge

General Information

Beginning of works: 2018
Completion: 2020
Status: project phase

Project Type

Location

Location: , ,
, , ,
Crosses:
  • Oder/Odra River
To replace: Kostrzyn Railroad Bridge
See also: Küstrin-Kietz Oder River West Branch Rail Bridge (2020)
Coordinates: 52° 34' 46.66" N    14° 37' 36.39" E
Show coordinates on a map

Technical Information

Dimensions

span lengths 130 m - 47 m - 46 m - 43 m
number of spans 4
number of tracks 2

Materials

deck steel
piers reinforced concrete
arches steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20074946
  • Published on:
    23/03/2018
  • Last updated on:
    27/03/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine