General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Nabburg, Schwandorf (Kreis), Bavaria, Germany |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 49° 28' 54.13" N 12° 8' 9.09" E |
Technical Information
Dimensions
length | 517 m | |
span lengths | 51.00 m - 5 x 62.00 m - 2 x 55.00 m - 46.00 m | |
number of spans | 9 | |
bridge surface | 15 252 m² | |
deck | width | 29.50 m |
piers | pier height | max. 33 m |
Quantities
abutments | concrete volume | 1820 m³ |
reinforcing steel | 189 t | |
deck | concrete volume | 12 197 m³ |
reinforcing steel | 2 214 t | |
foundations | concrete volume | 2 199 m³ |
reinforcing steel | 398 t | |
piers | concrete volume | 4 006 m³ |
reinforcing steel | 375 t |
Design Loads
live load | DIN FB 101 |
Cost
cost of construction | Euro 12 400 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
foundations |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Design
Structural engineering
Geotechnical/geological experts
Checking engineering
- Konrad Zilch (checking engineer)
Contractor
Formwork & shoring
Construction supervision
Relevant Web Sites
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2009. Deutscher Bundes-Verlag, Cologne (Germany), ISBN 978-3-935064-61-3, 2009, pp. 81-93.
- About this
data sheet - Structure-ID
20019691 - Published on:
18/02/2006 - Last updated on:
05/02/2016