0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Kreuzungsbauwerk Autobahndreieck Hochrhein

General Information

Beginning of works: 2009
Completion: 2010
Duration of works: 19 months
Status: in use

Project Type

Location

Location: , , ,
Part of:
Coordinates: 47° 35' 10" N    7° 45' 28" E
Show coordinates on a map

Technical Information

Dimensions

total width ca. 31.0 m
arch arch span 40 m
deck span lengths 23.5 m - 21.0 m - 23.5 m
number of spans 3

Quantities

substructure reinforcing steel 580 t
reinforced concrete volume 2 150 m³
superstructure prestressing steel 45 t
reinforcing steel 243 t
reinforced concrete volume 1 545 m³

Cost

cost of construction ca. Euro 4 000 000

Materials

deck prestressed concrete
arches reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20064755
  • Published on:
    19/03/2013
  • Last updated on:
    29/04/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine