General Information
Beginning of works: | 29 September 2007 |
---|---|
Completion: | 17 February 2011 |
Duration of works: | 41 months |
Status: | in use |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Construction method: |
Cut-and-cover method |
Location
Location: |
Tuttlingen, Tuttlingen (Kreis), Baden-Württemberg, Germany |
---|---|
Coordinates: | 47° 58' 38" N 8° 49' 6" E |
Coordinates: | 47° 58' 48" N 8° 48' 24" E |
Technical Information
Dimensions
length | 948 m | |
clear interior profile | 9.70 m x 5.00 m | |
piles | number | 1 700 |
Quantities
concrete volume | 27 000 m³ | |
reinforcing steel | 4 300 t | |
volume of extracted material | 145 000 m³ | |
shotcrete | 20 000 m³ |
Cost
cost of construction | ca. Euro 31 000 000 |
Participants
Owner
Client
Design
Traffic engineering
Structural engineering
Geotechnical/geological experts
Checking engineering
- I. Retzepis (checking engineer)
Co-contractor
Construction management
Site supervision
Tunnel equipment
Relevant Web Sites
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2011. Bundesministerium für Verkehr, Bau und Stadtentwicklung, Berlin (Germany), 2011, pp. 125-138.
- About this
data sheet - Structure-ID
20064777 - Published on:
20/03/2013 - Last updated on:
25/07/2014