General Information
Name in local language: | 神戸大橋 (Kobe Ohashi) |
---|---|
Beginning of works: | 1 April 1968 |
Completion: | 10 April 1970 |
Status: | in use |
Project Type
Structure: |
Half-through arch bridge |
---|---|
Material: |
Steel bridge |
Function / usage: |
upper deck: Road bridge lower deck: Road bridge |
Location
Location: |
Kobe, Hyogo, Japan |
---|---|
Next to: |
Kobe Portpia Bridge (1979)
|
Coordinates: | 34° 40' 42.12" N 135° 12' 13.58" E |
Technical Information
Dimensions
total length | 319.000 m | |
span lengths | 51.000 m - 217.000 m - 51.000 m | |
number of spans | 3 | |
lower deck | deck width | 20 m |
number of lanes | 4 | |
upper deck | deck width | 14 m |
number of lanes | 4 |
Quantities
structural steel | 6 500 t |
Materials
deck |
steel
|
---|---|
arches |
steel
|
Participants
Construction
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20005418 - Published on:
23/09/2002 - Last updated on:
07/08/2023