0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1933
Completion: 1933
Status: in use

Project Type

Structure: Deck arch bridge
Function / usage: Road bridge
Material: Reinforced concrete bridge

Location

Location: , , ,
Next to: Klickitat River Railroad Bridge (1908)
Coordinates: 45° 41' 48.14" N    121° 17' 28.89" W
Show coordinates on a map

Technical Information

Dimensions

main span 48.8 m
total length 80.8 m
roadway / carriageway width 7.3 m

Materials

substructure reinforced concrete
deck reinforced concrete
arch reinforced concrete
railing reinforced concrete

Chronology

1933

Opened to traffic.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20041230
  • Published on:
    14/12/2008
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine