0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Talbrücke Kleinenbremen
Beginning of works: December 2002
Completion: November 2004
Duration of works: 23 months
Status: in use

Project Type

Location

Location: , , ,
, , ,
Carries:
  • Autobahn A2
Next to: Kleinenbremen Viaduct (1938)
Coordinates: 52° 13' 13.74" N    9° 2' 12.67" E
Show coordinates on a map

Technical Information

Dimensions

total length 170.1 m
span lengths 27 - 29.1 m - 3 x 30 m - 24 m
number of spans 5
bridge surface 3 121 m²
deck deck width 18.85 m

Quantities

concrete volume 6 950 m³
prestressing steel 80 t
reinforcing steel 580 t

Cost

cost of construction Euro 5 900 000

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20048939
  • Published on:
    04/11/2009
  • Last updated on:
    05/03/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine