0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1970
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Clyde River
Carries:
  • M 8 Motorway
Coordinates: 55° 51' 21.04" N    4° 16' 12.65" W
Show coordinates on a map

Technical Information

Dimensions

span lengths 62.5 m - 143.3 m - 62.5 m
number of spans 3

Materials

superstructure prestressed concrete

Chronology

1999 — 2000

After discovering excessive deformations and problems with the substructure, the bridge undergoes a complete overhaul. The structure is changed from a monolithic pier connection to bearing supports, making it a simply supported bridge. Additional prestressing is introduced.

Participants

Reconfiguration
Design
Strengthening
Main contractor
Subcontractor
Prestressing

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20004204
  • Published on:
    05/07/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine