0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

King Willem Alexander Tunnel

General Information

Name in local language: Koning Willem-Alexandertunnel
Beginning of works: 2012
Completion: 16 December 2016
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , ,
Address: A2 (E25) / N2
Coordinates: 50° 51' 30.99" N    5° 42' 49.22" E
Coordinates: 50° 50' 26.40" N    5° 43' 2.31" E
Show coordinates on a map

Technical Information

Dimensions

number of tubes 4
eastern tube
lower tube length 2 170 m
upper tube length 1 860 m
western tube
lower tube length 2 170 m
upper tube length 2 050 m

Cost

cost of construction Euro 1 200 000 000

Chronology

16 December 2016 Opened to traffic

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20075560
  • Published on:
    07/09/2018
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine